Types of Procedures / Circulars

Terkini! Pemakluman Semakan Draf Pelan Pra-Hitungan Oleh Perunding Sebelum Mengemukakan Pelan Pra-Hitungan Untuk Kelulusan

  1. Pemakluman Semakan Draf Pelan Pra-Hitungan Oleh Perunding Sebelum Mengemukakan Pelan Pra-Hitungan Untuk Kelulusan

Pekeliling Jabatan Perancangan Pembangunan Bil. 4/2022 – Penambahbaikan Permohonan Kebenaran Merancang Tempoh Terhad (KMTT) Di Majlis Bandaraya Kuantan (Kali Ke-2)

  1. Pekeliling Jabatan Perancangan Pembangunan Bil. 4/2022 – Penambahbaikan Permohonan Kebenaran Merancang Tempoh Terhad (KMTT) Di Majlis Bandaraya Kuantan (Kali Ke-2)

Pekeliling Jabatan Perancangan Pembangunan Bil. 3/2022 – Garis Panduan Keluasan Lot Minimum Bagi Rumah Teres Kos Sederhana

  1. Pekeliling Jabatan Perancangan Pembangunan Bil. 3/2022 – Garis Panduan Keluasan Lot Minimum Bagi Rumah Teres Kos Sederhana

Pelaksanaan Modul Proses 4 (Pemeriksaan Interim) Secara Online Melalui Sistem OSC 3.0 Plus Online Di Majlis Bandaraya Kuantan

  1. Pelaksanaan Modul Proses 4 (Pemeriksaan Interim) Secara Online Melalui Sistem OSC 3.0 Plus Online Di Majlis Bandaraya Kuantan

Pelaksanaan Prosedur Permohonan Pemajuan Menara Atau Struktur Komunikasi Di Majlis Bandaraya Kuantan

  1. Pelaksanaan Prosedur Permohonan Pemajuan Menara Atau Struktur Komunikasi Di Majlis Bandaraya Kuantan

Pengemukaan Dokumen / Pelan Kelulusan ‘Soft Copy’ Dalam Format GIS (Geography Information System)

  1. Pengemukaan Dokumen / Pelan Kelulusan ‘Soft Copy’ Dalam Format GIS (Geography Information System)

Penambahbaikan Garis Panduan Kebenaran Merancang Tempoh Terhad Perubahan Material

  1. Penambahbaikan Garis Panduan Kebenaran Merancang Tempoh Terhad Perubahan Material

Pemakluman Pemakaian Sistem e-SR

  1. Notification of the Application of the e-SR System for the Development Proposal Application Process

Landscape Plan Submission Procedure

  1. Landscape Plan Application Submission Procedure
  2. Procedure for Setting Fees for Processing Landscape Plan Applications
  3. Landscape Plan Approval Application Process Payment Form

Building Temporary Permit Application Procedure

  1. Temporary Building Permit Application Procedure For Workers' Houses In Construction Sites
  2. Standard Operating Procedures (SOP) of Workers' Houses

New Application Submission Procedure and New Fees

  1. Submission of New Applications and New Fees

PKP Current Development Application Procedure

  1. PKP Current Development Application Procedure
  2. Procedure for Development Application Procedure During PKP / PKPD Period at OSC Kuantan City Council 24 May 2021 - 7 June 2021 (Subject to Current Instructions)
  3. 14 -Day Extension Notification for Submission of Development Proposal Plan Within the Period of Tightened Movement Control Order (PKPD) and Movement Control Order (PKP) for Kuantan District - Full Closure
  4. Local Authority One Stop Center (OSC) Standard Operating Procedures (SOP) for Conducting Construction Sector Operations During the Third Movement Control Order (PKP 3.0) and Post PKP 3.0
  5. Frequently Asked Questions (FAQs) Standard Operating Procedures (SOP) Local Authorities (OSC) For Conducting Construction Sector Operations During The Third Movement Control Order (PKP 3.0) and Post PKP 3.0
  6. Local Authority One Stop Center (OSC) Standard Operating Procedures (SOP) For Conducting Construction Sector Operations During The Third Movement Control Order (PKP 3.0) And Post PKP 3.0. (CCC Inspection Application)

Pahang State Secretary Circular

  1. Instructions for the Use of Self Regulated Application for Development Proposal for Pahang Darul Makmur Local Authority